Location
NSW
Value
$55M
The project involved a lot of integration between new and existing services, as Shore wanted to reutilise and reuse existing services wherever possible. Integrating with the existing systems in an economical way required some out-of-the-box thinking, so master planning methodologies were applied to future proof the systems and facilitate the growth and expansion of the campus.
The result was a sustainable, multi-purpose educational and sports facility. Featuring a pool, basketball courts, weights and cardio gyms, rowing rooms and gymnastics hall as well as 11 flexible teaching spaces and outdoor learning areas, the area ensures the students include movement into their everyday routines.